Solar installers in Púchov: office and service checks
Sources checked
A Púchov district entry does not automatically describe a customer-facing operation in the town. Confirm the site-visit, installation and service arrangements for the actual property, together with the legal identity in the contract.
District register examples
The saved SIEA public installer register snapshot of 22 October 2026 contained 15 PV entries in the district fields Púchov. This counts register records, rather than companies independently verified to serve the town or your property.
| Company / company ID | Registered address | District |
|---|---|---|
| A-THERM s.r.o. 36341711 | Ul. 1. mája 1159/30 PÚCHOV | Púchov |
| Dominik Rúček 51875748 | Slatinská 123 BELUŠA | Púchov |
| ELEKTROWERK, s. r. o. 54248329 | Rovňanská 392 LEDNICKÉ ROVNE | Púchov |
| ELIUS, s. r. o. 46383921 | Horenická 41 LEDNICKÉ ROVNE | Púchov |
| EMPAMA s.r.o. 51431793 | Dohňany 331 DOHŇANY | Púchov |
The selection uses the saved full table and exact company-ID matches. It is neither paid ordering nor a workmanship rating. A registered address may not be a customer-facing office, and a district is not a confirmed service area. Check the current record and the actual support programme before signing.
Registered office and operating address
ELEKTROWERK distinguishes its registered office in Lednické Rovne from its Púchov operation. Company ID 54248329 matched a PV entry in the saved register snapshot.
The supplier also publishes a Púchov installation with a Huawei inverter. The saved evidence does not verify its commissioning date, exact array rating or measured yield. The brand name does not establish compatibility with a proposed system for your home.
Local supplier material was checked on 21 October 2026 and cross-checked against the register on 22 October 2026. The relevant supplier pages are elektrowerk.sk. Supplier-published projects are not independent audits of annual household generation or bills.
Make the enquiry precise
Distinguish a survey visit from installation and later call-outs. Confirm which location handles each and what travel or service charges apply.
For an existing system, send exact model details and the electrical diagram rather than just the inverter brand. Compare complete work and warranty responsibilities before treating a nearby operation as the best option.